The Data Center Blacked Out Its Water and Power Numbers. Is It Worth Hiring a Lawyer to Pry Them Loose?
Updated October 1, 2026
So you asked the data center coming to your town how much water and power it'll pull, and you got back a page with the numbers blacked out. Then the comment section lit up: lawyer up, file a public-records suit, drag them to court. I went looking at what actually happened in towns that tried it. Short version: a lawsuit really does pry the numbers loose — courts keep forcing it. But the numbers usually show up after the vote that mattered is already over. So the real question isn't "sue or don't." It's what you're actually trying to win.
First I checked the obvious thing — does suing actually get the numbers?
Yeah. Over and over. In The Dalles, Oregon, the city itself went to court to keep Google's water use secret, arguing it was a trade secret. That fight dragged on for more than a year before Google gave up and the figures came out. Down in Dorchester County, South Carolina, officials fought a records request over a Google site for about a year, then handed over the water number to settle.
It's not just Google. In Racine, Wisconsin, Microsoft argued its draw from Lake Michigan was business-confidential. That failed too. Judges in Denver and El Paso County, Colorado ordered utilities to cough up data center water records after they claimed the files couldn't be released.
So the "trade secret" wall keeps falling. The tool works. The catch is the one nobody in the comments mentions: time. A records fight that resolves a year later is still a year later.
Then I looked at the timing, and it flipped how I saw it
Here's what I'd been missing. The decision that actually lets a data center get built — the rezoning, the special permit — happens at a public hearing. That's a totally different clock than a lawsuit.
And people win at that microphone. In Pinal County, Arizona, supervisors voted down a data center rezoning 4 to 1 after residents packed the room for hours. Tucson's city council killed a $3.6 billion Amazon project the same way — a room full of people, not a subpoena. Think of it like arguing with the ref during the game versus mailing in a complaint after the final whistle. One can still change the call. The other just goes in a file.
And what's getting decided at that hearing is big. One phase of one of these campuses can pull around 300 megawatts — enough to run roughly 200,000 homes on a hot afternoon. A records lawsuit that resolves next year can't un-pour a foundation that got approved this month.
So when is the lawyer actually the right call?
A few spots where I think it genuinely earns its keep. When the deal is buried under a non-disclosure agreement — some of these NDAs hide the water and power demand, and a handful hide even which company is behind the project. You can't comment intelligently on a thing you're not allowed to see. Prying that open before the hearing is exactly the kind of fight worth paying for.
The other one: the vote already happened and you need the evidence — to hold an official accountable, or to arm the next town facing the same playbook. And here's a piece I didn't know going in. If you win a public-records suit, the agency can be ordered to pay your attorney's fees. So "lawyer up" isn't automatically money straight out of your pocket — if you win.
If you lose or settle, that's a different story, and I couldn't pin down odds that hold everywhere, because every state's records law is its own animal. What I'd stop assuming is that the lawsuit and the hearing are the same fight. One gets you the truth. The other gets you the vote. You might need both, but not in that order.
What I'd actually do first
Before anybody hires anybody, figure out which clock you're on. Is there a hearing or a vote still coming? Then your energy goes to the room — that's where the thing gets stopped or shaped, and it costs you a night, not a retainer. Is the deal already signed and sealed behind redactions? That's when the records fight starts earning its fee, especially with those attorney's-fee rules in play.
We dug into the whole data center power-and-water mess — the gas turbines, the grid strain, who ends up paying for it all — and laid it out in plain language. Watch the full breakdown and subscribe on the Byte Bungalow YouTube channel, so the next time one of these shows up near you, you already know which fight you're in.
Common questions
If I win a public-records lawsuit, do I have to pay the lawyer out of my own pocket?
Can a data center really keep its water and power numbers secret with an NDA?
Our county official said not everything needs to go to a public vote. Can they really approve it without us?
Does showing up to comment actually change anything, or is it theater?
How do I actually help fight a data center proposal near me?
Keep reading
My Electric Bill Doubled and I Can't Move. Here's the First Lever I Pulled.
Retired, bill doubled from the data center boom, stuck in your house? The cheapest real lever isn't using less power. It's a phone call. Here's what I found.
A packed room made the developer walk — so why did the people who won tell everyone not to cheer yet?
Does showing up to a town hall actually kill a data center, or just push the vote to a quieter night? I dug into what really happens after the room clears.
To Escape Data-Center Rate Hikes With Solar — Is Rooftop a Trap and Ground-Mount the Smarter Buy?
Data-center rate hikes push homeowners to solar. Is rooftop a trap and ground-mount smarter? What leaks, insurance, and resale do to the real math.
They Already Voted Yes on the Data Center — So Why Are There Still Two Decisions Left?
The data center vote already passed? It's not the last decision. Here's the air permit and utility rate case you can still weigh in on.
Why Don't Data Centers Cool With Treated Sewage Instead of Your Drinking Water?
A lot of data centers already cool with treated wastewater. The ones that don't usually can't — and the reason comes down to a purple pipe.
If the Ocean's Right There, Why Cool Data Centers With Drinking Water?
The ocean's right there — so why cool data centers with drinking water instead of seawater? A few already do. Here's why it's rarer than you'd think.
Sources
- postandcourier.com — After fighting ~1+ year, Dorchester County agreed to publicize the water figure to settle, reversing trade-secret stance.
- techradar.com — The Oregonian challenge to The Dalles; legal dispute ran ~13 months before Google's water numbers (billions of liters/yr) came to light. (Source of the "more than a year / 13 month
- calonews.com — Pinal County AZ Board of Supervisors voted 4-1 against rezoning for a proposed data center after hours of public testimony (RAZE / Pinal Code Watchers packed the room).
- abc57.com — Elkhart County IN: 5 hours of public comment (2pm–7pm) on a data center rezoning; residents raised water-as-precious-resource concerns.
- planetdetroit.org — Washington Township MI planning officials postponed a rezoning decision after 3 hours of public comment.
Byte Bungalow
I do the homework out loud.
If this is the kind of thing you want checked against the documents instead of the hype, the video's above — and there's a new one every week.