Can They Really Take a Strip of My Land for a Power Line That Only Feeds a Data Center?
Updated September 26, 2026
Short version: in a lot of places, yes. A power company can take a strip of your land for a high-voltage line even when the thing on the far end is one giant data center. You'd get paid, and it goes through a state board, not a guy with a bulldozer and a grudge. But the reason it's legal is thinner than you'd guess — and once I pulled the thread, the land grab turned out to be the smaller half of the problem.
So can they actually take it?
A comment I saw put it flat: "they're using eminent domain to steal the land." The stealing part is off. You're owed "just compensation," and a power company can't just show up and start driving stakes.
Here's the actual move. Before it can condemn anything, the utility goes to a state commission and asks for a certificate of public convenience and necessity. That's a mouthful, so think of it as a permission slip that says: this project serves the public. Once a commission signs it, that slip hands a private company the government's power to take land — the same tool that runs highway on-ramps and gas pipelines across people's property.
So it's not lawless. What makes people uneasy is who's waiting at the other end of the wire. And the single thing that decides whether they can point that power at your fence line comes down to two words buried in the Fifth Amendment: public use.
The whole thing hangs on two words
Public use. That's the whole ballgame.
Back in 2005, the Supreme Court read those two words so loosely — in a case called Kelo v. City of New London — that a city was allowed to take people's homes and hand the land to a private developer, on the theory that the new development might fatten the tax base. The backlash was enormous. Something like 45 states turned around and passed laws reading their own constitutions tighter than the federal floor. So the ground rules genuinely change depending on which state's dirt you're standing on.
Now run the data center version through that filter. NextEra wants to string a 500-kilovolt line across about ten miles of Greene County, Pennsylvania — and by the company's own account it's there to carry power to data centers in northern Virginia. When the construction crews pack up and leave, the number of permanent jobs that line leaves behind in Pennsylvania is zero. A local advocate put it plainly: it does not benefit anybody in Pennsylvania.
That's the exact nerve landowners keep pressing. In one case the Mississippi Supreme Court threw out a condemnation because the line wouldn't serve in-state customers. I went looking for a clean national answer on whether a line for one private customer counts as "public," and I couldn't find one, because there isn't one yet. These fights are happening right now, court by court, and the judges keep circling the same question: when a power line basically exists to feed a single company's servers, is that still public use?
The part I didn't see coming
Here's where my assumption flipped. I walked in thinking the land was the whole fight. It isn't.
A commenter who'd built a house laid it out better than any lawyer: when you put a home on a bare lot, you pay to pull the wires and set the transformer to your own property. A data center should be no different. Except a lot of the time, it is different. When a giant new customer needs a substation, the rules in many places let the utility spread that cost across everybody's bill, on the logic that the whole grid sort of benefits.
So follow that to its end. Even if a surveyor never sets foot in your backyard, you can still end up paying for the buildout — it shows up as a line item on your monthly electric bill, and the grid's own market monitor pegged the added cost from data center demand in one region at roughly thirteen billion dollars, sliced up and mailed out to regular ratepayers. The strip of land is the fight you can see. The other one is hiding four lines down on your power bill.
Where this leaves you
So — can they take your strip? Depends on your state, and on whether a judge buys the "public use" argument for a line that mostly feeds a server farm. That's being decided case by case as you read this, and I'm not going to pretend it's settled when it plainly isn't.
But you can at least know exactly what you're looking at when a survey letter lands in your mailbox — the permission slip, the two words the whole thing hangs on, and the bill you might pay whether or not the towers ever cross your land.
That's the whole reason Byte Bungalow exists. We chase these AI-power stories all the way down to the substation and the transformer, so the scary headline actually turns into something you can follow. If you want the full walk-through of how a data center reaches across four states to pull power through somebody's farm, come watch the video breakdown and subscribe on YouTube — that's where we take these apart, piece by piece.
Common questions
Can a power company take my whole property, or just a strip?
Do I actually get paid if they condemn my land?
What is a "certificate of public convenience and necessity"?
Can I fight it and win?
If they don't take my land, am I off the hook?
Keep reading
My Electric Bill Doubled and I Can't Move. Here's the First Lever I Pulled.
Retired, bill doubled from the data center boom, stuck in your house? The cheapest real lever isn't using less power. It's a phone call. Here's what I found.
A packed room made the developer walk — so why did the people who won tell everyone not to cheer yet?
Does showing up to a town hall actually kill a data center, or just push the vote to a quieter night? I dug into what really happens after the room clears.
To Escape Data-Center Rate Hikes With Solar — Is Rooftop a Trap and Ground-Mount the Smarter Buy?
Data-center rate hikes push homeowners to solar. Is rooftop a trap and ground-mount smarter? What leaks, insurance, and resale do to the real math.
They Already Voted Yes on the Data Center — So Why Are There Still Two Decisions Left?
The data center vote already passed? It's not the last decision. Here's the air permit and utility rate case you can still weigh in on.
Why Don't Data Centers Cool With Treated Sewage Instead of Your Drinking Water?
A lot of data centers already cool with treated wastewater. The ones that don't usually can't — and the reason comes down to a purple pipe.
If the Ocean's Right There, Why Cool Data Centers With Drinking Water?
The ocean's right there — so why cool data centers with drinking water instead of seawater? A few already do. Here's why it's rarer than you'd think.
Sources
- theconversation.com — Governments delegate eminent domain to utilities/"common carriers." Kelo v. City of New London (2005) held economic development qualifies as "public use"; triggered 45 states to en
- fortune.com — Georgia Power grid expansion: 1,000+ miles of transmission lines across 330+ parcels including residential; ~10 GW new generating capacity over 5 years; ~80% expected to power data
- alleghenyfront.org — NextEra Energy Transmission MidAtlantic Inc.; 107-mile MidAtlantic Resiliency Link, 10-mile Pennsylvania segment through Greene and Fayette counties; 500-kV line moving WV coal-fir
- fortune.com — Utilities in Georgia, Maryland, Virginia, Indiana, Pennsylvania condemning private property for lines that by their own accounting mostly serve AI data centers. "Public use" is the
- millermillercanby.com — In Maryland, utilities authorized to use eminent domain through the Public Service Commission's issuance of a Certificate of Public Convenience and Necessity (CPCN). Confirmed CPCN
Byte Bungalow
I do the homework out loud.
If this is the kind of thing you want checked against the documents instead of the hype, the video's above — and there's a new one every week.
Subscribe on YouTube →By Byte Bungalow. Home power and home tech, checked against the documents instead of the hype. Independent commentary; not affiliated with any manufacturer, utility, or builder named here. Not professional electrical advice.